Forum Discussion

Yado_52136's avatar
Yado_52136
Icon for Nimbostratus rankNimbostratus
Nov 19, 2007

About the parallel processing of iRules

iRules-A and iRules-B are set as VirtualServerA and B, respectively.

 

 

 

The loop of the communication A is carried out by iRules-A (while sentence), and FLG of a global variable is made to supervise first. (When FLG is changed into "1", it escapes from a loop)

 

 

Next, iRules-B is started by Communication B and FLG of a global variable is changed into "1." (Communication A escapes from a loop at this time)

 

 

 

 

Is performing the above processings possible?

 

 

Under the present circumstances, although iRules-A is that which moves satisfactorily (the loop of the communication A is carried out), while carrying out loop processing, iRules-B does not move. (After processing of Communication A is completed by timeout etc., iRules-B moves)

 

 

Can't iRules-A and iRules-B be moved simultaneously?

 

14 Replies