Yado_52136
Nov 19, 2007Nimbostratus
About the parallel processing of iRules
iRules-A and iRules-B are set as VirtualServerA and B, respectively.
The loop of the communication A is carried out by iRules-A (while sentence), and FLG of a global variable is made to supervise first. (When FLG is changed into "1", it escapes from a loop)
Next, iRules-B is started by Communication B and FLG of a global variable is changed into "1." (Communication A escapes from a loop at this time)
Is performing the above processings possible?
Under the present circumstances, although iRules-A is that which moves satisfactorily (the loop of the communication A is carried out), while carrying out loop processing, iRules-B does not move. (After processing of Communication A is completed by timeout etc., iRules-B moves)
Can't iRules-A and iRules-B be moved simultaneously?